The Government of Punjab, under the leadership of Chief Minister Maryam Nawaz, has introduced a groundbreaking initiative aimed at reducing electricity costs and promoting renewable energy in the province. Known as the Free Solar Panel Scheme or the Roshan Gharana Program, this project specifically targets low-income households struggling with rising electricity bills. The latest August 2025 update brings important details on eligibility, registration, and the selection process.
Purpose of the Scheme
The primary objective of the Free Solar Panel Scheme is to provide an affordable and sustainable source of electricity to households with limited income. By installing solar systems free of cost, the government aims to reduce dependency on expensive grid electricity, lower monthly utility bills, and contribute to the adoption of clean energy in Pakistan.
This initiative also reflects Punjab’s broader vision of creating an eco-friendly and self-reliant energy sector while improving the living conditions of economically disadvantaged families.
Read Also: How to Receive Your Payment Through SMS For BISP 8171 August 2025 Update
Eligibility Criteria (August 2025 Update)
To ensure the scheme benefits the most deserving families, the government has outlined clear eligibility requirements:
Monthly Electricity Consumption
- Households consuming 0–200 electricity units per month qualify for free solar panel installation.
- Families using 0–100 units will receive a solar system with approximately 550 watts of capacity.
- Those consuming 101–200 units will get a system of around 1,100 watts.
Valid Electricity Connection
- Applicants must have a registered and active electricity meter in their name.
- The meter should be free from tampering, theft, or illegal connections.
Payment Record
- Applicants must have a clean bill payment history.
- Consumers who have defaulted more than three times in the last 12 months are considered ineligible.
Who Is Not Eligible?
Certain categories of applicants are excluded from the scheme, including:
- Electricity thieves or users with tampered meters.
- Consumers with multiple connections in the same home.
- Families with frequent non-payment of bills.
- Those already receiving government-subsidized solar installations under other programs.
Checking Application Status
Applicants can check their status in the following ways:
- Online—Visit the official application result portal, enter your bill reference number, and check whether your application is Under Review, Approved, or Rejected.
- SMS Alerts—Approved applicants are notified via SMS after the selection process.
- Helpline—Call the official solar program helpline and provide your CNIC for an update.
Selection Process
Due to high demand, the scheme operates through a transparent balloting system:
- After registration closes, the government conducts computerized draws to ensure fairness.
- Successful applicants are contacted directly for verification and scheduling of installation.
- Installation is carried out by approved government contractors to ensure quality and safety.
Implementation and Phase-1 Target
In Phase 1, the government aims to install 100,000 solar systems across Punjab.
- Registration for Phase 1 ended on 5 January 2025.
- Balloting took place in June 2025.
- Installation work began in March and is expected to be completed by July 2025.
Future phases are anticipated to expand coverage to additional households, contingent upon budget allocations and program success.
Benefits of the Free Solar Panel Scheme
- Reduced Electricity Bills—Solar energy reduces dependence on costly grid electricity.
- Environmental Impact—Promotes the use of clean, renewable energy sources.
- Energy Independence—Families can generate their electricity and reduce load-shedding issues.
- Long-Term Savings—Once installed, solar panels provide years of free power with minimal maintenance.
Government’s Commitment
Maryam Nawaz has repeatedly emphasized her government’s dedication to improving the lives of Punjab’s underprivileged citizens. By launching this solar panel scheme, the provincial government is not only addressing economic challenges but also moving towards a sustainable energy future.
Final Words
The Maryam Nawaz Free Solar Panel Scheme is a major step towards energy affordability and environmental protection in Punjab. Low-income households using up to 200 units of electricity monthly should immediately check their eligibility and apply. With a fair selection process, transparent balloting, and government-funded installation, this initiative offers real hope to families struggling with high electricity costs.
For More Information, Click Here